33KV TRANSMISSION LINE

ORBITAL SCOPE

Engineering, Procurement, Construction & Commissioning of 33kV over head line extension to the existing power infrastructure of OGC, to provide power to BVS-01 block valve station.

PROJECT DESCRIPTION

Punjlloyd was executing the Engineering, procurement and construction of this project of Oman gas Company S.A.O.C. The scope of work in the above contract includes all activities necessary and required in and for the completion of instrumentation works, testing and pre-commissioning of the block valve stations.

KEY DATA

Location : Saih Rawal
Client : Oman Gas Company
Year : 2009
HSE Status : No LTI
Major Achievement : Managing Interface between PDO & OGC and Achievement of     shutdown deadline without any oil deferment

project
project
project
project
project
project
project
project
project
project
project
project
project
ELECTRICAL & INSTRUMENTATION WORKS FOR AL-GUBRAH INDEPENDENT WATER PROJECT

ORBITAL SCOPE

Complete Electrical & Instrumentation Installation activities for the completion of the Project. Also assisting the Pre-commissioning & Commissioning activities. 

Electrical Works

• Installation of 2nos. of 132/11.5Kv, 50MVA Power Transformers,  2nos. of 500kVA, 11/.433kV Earthing Transformers,  2 nos. of 7.5MVA, 11/6.9kV Transformers, 10nos 2.5MVA, 11/.433kV Transformers
• Installation of 2nos of 11kV, 1000A, 6.35 Ohm 30Sec NERs, 2nos of 6.6kV, 300A, 42 Ohm 30Sec NERs, 2nos of 11kV, 4.5MVAR Capacitor banks, 2nos of Battery Racks & 2 nos of Battery Chargers, 8nos. of HV VFD panels, 2nos of Capacitor Control Panels in Electrical Building-1
• Installations of 2nos. of Transformer Relay Panels(TR-1 & TR-2), 2nos of Remote Tap Changer Control (RTCC-1 & RTCC-2), 2nos of Automatic Power Factor Control Panel(HV APFC-1 & HV APFC-2), 1no of Remote I/O Panel, 2nos of LV VFD Panels (LV VFD-1 & LV VFD-2), Battery Racks, 11Kv HV Panel (1no), Battery Rack, Battery Isolator, Battery Charger & DCDBs(2nos), LVPMCC Panel (LVPMCC-1), MPDB-1, MACDB-1 etc in Electrical Building-1.
• Installation of Bus Duct From Transformer Yard to Electrical Building-1, Transformer Area & Generator Area to Panel Room in Electrical Building-2.
• Installation of LVP MCC Panel(LVPMCC-2), MPDB-2, UPS Panels (UPS-1 & UPS-2), Remote IO Panel(1no), Battery Isolator, Battery Racks(2nos), 1250kVA Standby DG etc in Electrical Building-2
• Installation of MV Panel(1no), Automatic Power Factor Control Panel, MV VFD Panels (5nos), Battery Charger (B.C-1&2), Battery Rack 1&2, Remote I/O Panel(1no), LV PMCC Panel (LVPMCC-3)etc in Electrical Building-3.
• Installation of Local Push Buttons for Pumps, Mixers, Scrappers, etc (Approx. 180 nos.)
• Laying, Dressing, Tagging, Glanding & Termination of all HV,MV & LV Power Cables & Electrical Control Cables (Approx. 200Kms)  Including Joining of 11kV & 6.6kV Cables, Installation of  HV and MV Termination Kits
• Supply & Installation of 25 tons of supports wit C5M high durability painted steel for the Outdoor & 35 tons of hot deep galvanized supports for indoor, basements (electrical buildings) and cable trench, Meggering & Loop Checking of the Power & Control Cables.
• Installation of earthing system: Installation of Earth Trip/Cable. The Scope also Includes Supply & Installation of Bulk Materials like Cable ties, Cable Lugs etc. and Consumables like welding mold & welding powder.

 

Instrumentation Works

• Installation of Field Instruments Such as sensors, transmitters, analyzers, LCPs, JBs, LPBs, RTUs etc.
• Supply, Fabrication & Installation of Supports for Cable Trays, Transmitters, LCPs, JBs etc
• Laying, dressing, tagging, Termination & Glanding of Instrumentation Control Cables, FOC cable, Profibus, Cat.6 & Modebus Communication Cables  (Approx. 230Kms)
• Splicing and OTDR testing of FOC Cables.
• Installation of Impulse and airline tubing of Instruments.
• Calibration and testing of Instruments.
• Meggering & Loop Checking of the Instrumentation Cables.

KEY DATA

Location : Al Gubrah
Client : International Water Treatment LLC
Contract : Orbital Projects & Services LLC
Year : 2014

project
project
project
ORPIC CO-GENERATION PROJECT

ORBITAL SCOPE

Orbital Projects & Services LLC’s Scope include Installation of  Electrical, Instrumentation, Control & Automation works related to the completion of the project.

 

PROJECT DESCRIPTION

ORPC Co-Generation Power plant is a power facility to provide clean and reliable energy to the refinery and its customers. This facility also ensures the reliable supply of steam, desalinated water, process water and instrument air to the refining units.

The project includes 2x25 MW Gas Turbine, 2x100 TPH HRSG, Supplementary Firing Aux. Boiler, Desalination Plant, Polishing Plant, Fuel Gas Conditioning, Warehouse Re-location etc.

KEY DATA

Location : Sohari
Client : Oman Oil Refineries and Petroleum Industries Company (Orpic)
Contract : HICO / Orbital Projects & Services LLC
Year : 2010 - 2011

project
project
project
project
project
ELECTRICAL & INSTRUMENTATION WORKS FOR A\'SEEB WASTEWATER PROJECT

ORBITAL SCOPE

PROJECT DESCRIPTION

Haya water responsible for the waste management in sultanate’s capital, is supporting the development of the nation by implementing the Muscat wastewater master plan in the Governorate of Muscat. A’seeb waste water project is a primary element of Muscat wastewater master plan. There is  wastewater treatment plant, 3 nos of main pumping stations, recycled water facilities at Al-Khoudh & Al-Mobellah as part of this project. The plant designed to treat 80,000 cubic meters of sewage waste water per day. The plant utilizes special technology known as Sequential Batch Reactor (SBR) process and ultra-filtration. The process selection was done based on available processes in international market. The main Sewage Treatment Plant (STP) unit will be located at Seeb about 45 km from Muscat. The STP will be designed to have odorless treated water output which will be mainly used for irrigation purposes.

ORBITAL SCOPE

Electrical & Instrumentation Installation activities for the completion of the Project. Also assisting the Pre-commissioning & Commissioning activities.

Electrical Works

•Installation of Transformers (2 nos of 33/11kV, 4 nos of 11/0.433kV Oil type & 2 nos of 11/0.433kV Dry type)

• Installation of 33kV MV Panel, 11kV Panel, Control & Relay panels etc

• Installation of 11kV capacitor Bank.

• Installation of 415v LV Panels & MCC Panels (Make: ABB & Schneider)

• Installation of UPS System, Battery Chargers & Battery Racks (10 nos)

• Installation of different type of DBs’, Isolators etc.

• Laying of Power & Control cables (Approximately 1,015 Runs)

• Glanding & Termination of Power & Control cables (Approximately 10,200 termination points)

• Fabrication & Installation of Cable trays/Ladders (Both HDG & FRP type) & Conduits (Both GI & PVC)

• Fabrication, Painting & Installation of Structural Supports for cable trays/Ladders, Panels etc.

• Installation of lighting system & receptacles, switches, sockets etc.

• Installation of Area Lighting street Light poles including the installation of Foundations.

• Installation of the Lightning protection & Earthing system

• Installation of Fire alarm system, Telephone & Public address system.

• Excavation & back filling including pre-padding & Post-padding of Cable trenches.

Instrumentation Works

• Installation of DCS Panels (Make: Honeywell)

• Installation of Field Instruments such as Pressure Transmitters, Temperature Transmitters, Diff. Pressure Transmitters, flow transmitters etc (Make: Honeywell)

• Installation of Field junction boxes, LCPs

• Laying of Instrument cables (Approximately 2,950 Loops)

• Glanding & termination of Instrumentation cables (Approximately 32,500 Termination points)

• Laying, splicing & OTDR testing of Fiber Optic cables.

• Installation of Cable trays (Both HDG & FRP type)

• Installation of Impulse tubing for the Instruments such as Transmitters & Control Valves

• Fabrication, Painting & Installation of Structural Supports for cable trays, Inst. Panels, Junction Boxes, Instruments etc.

• Installation of CCTV system, Access control system.

KEY DATA

Location : A'Seeb
Client : Haya Water
Main Contract : Hyundai Rotem Company
Subcontractor : Orbital Projects & Services LLC
Year : 2013 - 2014

project
project
project
project
project
project
project
project
project
MEP WORKS AT 200 MLD INDEPENDENT WATER PLANT IN QURAYYAT

ORBITAL SCOPE

The scope of supply and installation of MEP Works includes the following activities:

 

• HVAC Installation Works

• Electrical, CCTV, Telecom, Data, PA, Access Control & Smart

  Clock System Works

• Plumbing Works

KEY DATA

Location : Qurayyat
Client : Oman Power & Water Procurement Co.
Main Contractor : Hyflux EPC LLC
MEP Contractor : Orbital Projects & Services LLC
Year : 2017